Industrial Facility Modernization

The Challenge

Our client was a large Architect Engineering (AE) firm responsible for the design build of a significant modernization of an industrial facility. The client was working with multiple design options for the project and needed to be able to evaluate the alternatives effectively before final presentation to the end-customer. Such evaluation required accurate budgetary cost estimates for each design option be developed.

 

The Outcome

Management Solutions developed accurate budgetary cost estimates, as well as a Basis of Estimate report, for each of the design options within a compressed time frame. The estimates enabled the AE firm to save time in evaluating the feasibility of each design. Our client was also able to be more cost effective specific to the design and installation costs.